• “Over the last 12 months MIDDAS have worked closely with the Jaguar Land Rover engineers to successfully design & deliver a bespoke solution which has transformed the facility beyond our expectations”
    Mr I. Bugby
    Equipment and Installations Manager,
    Global Facilities Engineering
    Mr J. Vickers
    Senior Manager,
    Global Facilities Engineering

    JAGUAR LAND ROVER
    WEST MIDLANDS, UK


    Project Overview

    Project
    Jaguar Land Rover, Engine Manufacturing Centre Module 4, i54
    Location
    Wolverhampton, West Midlands
    Application
    Advanced manufacturing facility
    Walls
    M100 in 100mm & 200mm formats. 10m high solid & glazed walls, standalone Pods for QA and amenity areas
    Ceilings
    N/A
    Doors
    N/A
    Glazing
    60-minute fire rated, fully flush to 7.6m high
    Miscellaneous
    Bespoke engineering solutions for a number of complex architectural details
    Performance
    60-minute fire rated to BS 476 Part 22

    Background

    The result of £1bn investment, Jaguar Land Rover’s state-of-the-art Engine Manufacturing Centre is home to the Ingenium family of advanced, ultra-efficient petrol and diesel engines. MIDDAS were selected by JLR and their construction team, led by Associated Architects and Vinci Construction UK, to provide our M100 bi-panel product for the latest Module 4 phase of works.

    Brief

    A requirement for a fully-flush, bi-panel wall system to divide manufacturing and administration areas, with wall heights of 10m and fire performance requirements of 60-minutes integrity & insulation. Separate Quality & Amenity enclosures were also specified within the facility, incorporating flush glazing and details to provide a clean, state-of-the-art facility and environment for all processes.

    Solution

    MIDDAS provided our M100 bi-panel, wall system in a variety of specifications and configurations, meeting all requirements for the project. Being fully tested and certified for fire rating to over 60-minutes, with flush glazing and to the required heights without the need for secondary supports for the walls. Bespoke details were engineered to find solutions to several architectural and construction conundrums throughout the project.

    Contact Us

    Please contact us either by phone or email we can be found at the following addresses:


    • Head Office & Factory
    • Unit 47 Atcham Business Park, Atcham,
      Shrewsbury SY4 4UG

    • Email : info@middas.co.uk
    • Phone : +44 (0) 01743 294141

    • London Office
    • Level 3, 12 Greenhill Rents,
      London EC1M 6BN

    • Email : info@middas.co.uk
    • Phone : +44 (0) 1743 292674

    Social