• “MIDDAS supported BYES from the very onset of the project with their modular freestanding cleanroom solution. The freestanding structures provided an ideal solution for the client’s requirement for controlled and contained environments within an existing building, and suited the tight timescale. The performance ratings and robustness of the MIDDAS structure meant the newly built advanced manufacturing facility could support MEP services without impacting the load on the external building structure."
    Allan Miller, Director of Cleanrooms and Laboratories
    Bouygues Energies & Services

    CAMBRIDGE TECHNOLOGY TAUNTON, UK


    Project Overview

    Project
    Cambridge Technology cleanrooms and support areas
    Location
    Taunton, Somerset
    Application
    Cleanrooms and support areas for manufacturing of optical components
    Walls
    M100 (FR60, NFR)
    Ceilings
    MCT
    Doors
    Single/double leaf solid and glazed (FR60; NFR)
    Glazing
    M100 flush glazed (FR60; NFR)
    Miscellaneous
    MIDDAS freestanding structure with full height fire walls
    Third party plasterboard finishes to MIDDAS structural framework
    Black panels for dark room areas
    Performance
    FR60/60 walls (Class 0 spread of flame)
    0.9kN/m2 distributed services loading

    Background

    Cambridge Technology, a Novanta company, handles hazardous materials in contained and controlled environments for the manufacture of specialist mirrors for laser guidance systems. They needed to vacate their existing headquarters and considered options between a purpose-built new building or a speculative build for new factory units. Due to a restricted timescale, they opted to fit out a series of adjacent warehouses, as there wasn’t enough time to design and build from scratch.

    Brief

    The client decided to build completely freestanding structures to specification within an existing structure. The internal freestanding structures would enclose all manufacturing lines in classified cleanrooms and form the surrounding support areas, including offices and staff welfare. No load or permanent structures could be added to the external building.

    Solution

    Due to the size of the existing building, multiple units were joined to create one larger facility for all manufacturing and support processes. MIDDAS designed a freestanding solution with structural steel framework to support all MEP services and ceilings. Our M100 partitions were used in all cleanroom areas, modulated to fit the clients’ processing equipment, including vacuum furnaces. In the non-cleanroom and welfare areas, MIDDAS framework and freestanding structure were overlaid with traditional build office finishes (plasterboard). The M100 partitions were installed at full height to create fire separation and were fitted with fire rated flush vision panels and doors.

    Contact Us

    Please contact us either by phone or email we can be found at the following addresses:


    • Head Office & Factory
    • Unit D1-D4, Halesfield 5, Telford,
      Shropshire, TF7 4QJ

    • Email : info@middas.co.uk
    • Phone : +44 (0) 01743 294141

    • London Office
    • Level 3, 12 Greenhill Rents,
      London EC1M 6BN

    • Email : info@middas.co.uk
    • Phone : +44 (0) 1743 292674

    Social