MIDDAS Demountable, steel partitioning systems - Part 2 Demountable Partitioning Solutions - MIDDAS partitioning UK

 

We’ve just expanded our London base and are opening the doors to our new office during Clerkenwell Design Week 2018 22nd – 24th May.

We’re located right above the ‘Light’ hub within fabric EC1 so if you are attending Design Week why not pop in and see our new London office located in the heart of Farringdon. We’ll be showcasing our architectural solutions for the Commercial, Industrial and Healthcare sectors.

It’s the detail that counts.

As a UK designer & manufacturer we add those finishing touches and practical solutions to our walling systems.

This bespoke shelving is fully integrated and supported from our wall system and was designed for a prestigious collection of rare vinyl records for the famous fabric nightclub and record label’s offices.

The MIDDAS freestanding hygienic partitions with fully integrated Dortek doors project is nearing completion.

We have created a barrier to provide people and product segregation with a series of interlocked transfer zones and controlled access ways, which is easily cleaned and maintained (flush finishes with minimum ledges).

MIDDAS offsite manufacture has more than programme benefits.

The advantage of offsite manufacture can be seen by the speed the MIDDAS structural frame has been installed. All components arrive at site, clearly identified and ready to install. We even punch all fixing holes which makes installation a simple assembly process, significantly reducing site construction activity.

MIDDAS new Diodes semiconductor cleanroom project win featured in key industry publication Cleanroom Technology.

Read more here

 

 

 

 

 

 

 

 

 

 

 

The MIDDAS M65 mono block wall system and door sets have been selected for the new MOSFET facility for Diodes Zetex Semiconductors in Oldham.

The MIDDAS wall systems offer a modular solution for the cleanrooms with pre formed corners, column casing and return air ducts. All wall panels are manufactured to size in our UK factory, ready to install with head and floor tracks. This modular approach significantly reduces site construction activity and offers a build clean solution which is key in any Semi facility.

We’re really proud to see Charlotte Thomas enter the second year of her MIDDAS Engineering Apprenticeship. Having spent the first year focusing on design, Charlotte is now fully engaged in the manufacture of our products and has been given formal training on all our production equipment including CNC punch machine and break presses.

At MIDDAS we have continued the development of our walk-on ceiling systems and now offer a fully tested product that allows individual ceiling planks to be taken out without the need to remove adjacent ceiling planks.  The ability to remove individual elements of the ceiling permits easy reconfiguration, should future changes be made to the HVAC, lighting, or equipment throughout the life of the facility.

Another good week at MIDDAS – we’ve just started a new project at GSK Barnard Castle.  Not a cleanroom, but half-glazed freestanding partitions to manage both people and product flow around a process line.

A key feature of the MIDDAS solution is the integration of Dortek doors, again not standard solutions.  MIDDAS and Dortek have worked closely with the GSK team and Interserve to optimise space and functionality of the area.

The new scheme includes the latest Dortek horizontal rapid roller doors, telescopic sliding doors as well as standard hinged arrangements.

MIDDAS have recently completed the installation of fire rated flush glazed walls and fire rated automated door sets, within a flag ship building at the University of Birmingham.

The MIDDAS triple glazed M100 system offers 30 minute fire rating and excellent acoustic performance.

Precision Cleanrooms have recently selected and installed MIDDAS wall panels, flush glazed screens and door sets for a prestigious cleanroom build in Ireland.

MIDDAS manufactured the M65 panels to size ready for installation, significantly reducing site construction activity.

MIDDAS are pleased to announce the appointment of Dr Joe Giordano MRICS MCIPR as Non-Executive Director.

A Chartered Quantity Surveyor who has spent his career advising banks and developers on some of the largest projects in the UK and Europe, Joe brings 20 years of experience in business generation and growth strategy.

Joe, sits on the Royal Institution of Chartered Surveyors Construction iSurv editorial board, developing knowledge centres to circa 100,000 members and is a member of the Chartered Institute of Public Relations, providing support and mentorship to a number of high level business leaders.

At MIDDAS we are now supplying our fire rated, flush glazed walls and vision panels for installation into masonry and stud & plaster walls, as well as 3rd party Cold Room panels.

‘Made in Britain’ – as a primary UK manufacturer we offer a wide range of sizes in both 30 minute and 60 minute

A significant new project win places MIDDAS firmly in the Healthcare Sector and was won against traditional construction methods!

MIDDAS has been selected by cfes Limited to design and deliver the architectural envelope for a new Off-Site CSSD (Central Sterile Services Department) for the Royal Free London NHS Trust, a new high-tech, centralised facility for Barnet Hospital, Chase Farm Hospital and the Royal Free Hospital.  Our scope includes all the walls, doors and ceiling systems and will show case MIDDAS’ industry leading, modular, off-site construction capabilities; whilst meeting the highest healthcare standards.

Contact Us

Please contact us either by phone or email we can be found at the following addresses:


  • Head Office & Factory
  • Unit 47 Atcham Business Park, Atcham,
    Shrewsbury SY4 4UG

  • Email : info@middas.co.uk
  • Phone : +44(0)1743 294141

  • London Office
  • Level 3, 12 Greenhill Rents,
    London EC1M 6BN

  • Email : info@middas.co.uk
  • Phone : +44 (0)1743 292674

Social