Fire performance partitions | MIDDAS Demountable, steel partitioning systems Demountable Partitioning Solutions - MIDDAS partitioning UK

More and more we are being asked to provide commercial interiors without a cleanroom in sight. Our demountable partitions ensure flexibility throughout the life of a facility as they can be simply reconfigured or dismantled and relocated for reuse or recycled when not required (no demolition or construction waste).

Our latest case study covers another critical healthcare project for the Royal Free Hospital, London where we built one of the UK’s largest off-site Sterile Services Departments within an existing industrial building with all important transport links.

The MIDDAS structural framework for our M100 non- progressive bi panel partition system not only supports our pre finished wall panels but is designed to allow services to be easily routed through it and can be configured to support and integrate process and HVAC services into the cleanroom envelope, all pre engineered off site ready to install.

Our latest range of flush glazed door sets, manufactured by MIDDAS here in Shrewsbury have been received very well by our cleanroom clients and those within the commercial fit-out sector.  These are destined for a major Pharmaceutical project in Switzerland and have been specifically engineered for end-user specified door furniture and controls which have been fitted in our factory, significantly reducing installation time on site.

Great to hear during yesterday’s Government briefing that one of our recent cleanroom projects with ISO 4 and ISO7 classifications is playing a key part in the fight against COVID 19.

Due to ongoing pharmaceutical and healthcare projects and increased demand for our Cleanroom products, our factory is still fully operational but with capacity for Partitions, Doors and Ceilings; fully fire rated if required.

MIDDAS have been awarded a major healthcare project at the BUPA Cromwell Hospital for an new Adult Intensive Care Unit (AICU) by Howorth Air Technology, BUPAs delivery partner for this prestigious project.

The project required a modular partition solution with excellent acoustic performance and fire rating (60 minutes integrity and insulation) which is backed by MIDDAS’s extensive test data.

Having identified MIDDAS as a supplier of demountable fire rated partitions. Chelsea FC are delighted with the end result designed, manufactured and installed by MIDDAS.

Development and testing of the MIDDAS flagship, M100 bi-panel system continues at a relentless pace with the latest focus being sound insulation performance.

Its go good when you see a project from initial sketches and basic outlines to the facility nearing completion. Scale is lost on a drawing and it’s only when you walk through a project you appreciate the full scope and how those details really work.

The MIDDAS framework negated the need for secondary steel work, with all services being distributed from the MIDDAS free standing structure.

Chelsea Football Club, our latest customer, needed a fully demountable fire rated partition system to create safe access routes at their Stamford Bridge stadium. The MIDDAS M100 wall system was selected as it has been independently fire tested as a complete system with doors and vison panels.

Chelsea FC needed a system that facilitated the reconfiguration of their corporate hospitality space in order maximise use outside of match days.  The MIDDAS M100 is fully demountable and each component is numbered for easy re-assembly and re-installation.

Having just recently installed a 6m high fire rated wall for a leading Formula 1 team, it’s great to add a premiership football team to our ever expanding and completely diverse client base.

On the back on an excellent project in India for TATA Motors, MIDDAS are now exporting more and more projects to international regions. A key success factor is MIDDAS’ approach to modularisation which ensures all interfaces are factory prepared and the solution is simply installed from a-kit-of-parts, no construction just assembly on site.

A very topical update in light of today’s news that fire doors from five manufacturers have been withdrawn from the market after failing post-Grenfell safety tests.

With fire safety absolutely central to all of MIDDAS’ product offering it’s fair to say we were incredibly sensitive not to jump on the post-Grenfell outcry

We can’t believe how quickly time goes and the positive follow ups we’ve had since opening the doors of our new office/showroom during the recent Clerkenwell Design Week.

MIDDAS are now being considered for specialist office fit out projects where fire rating, demountability and height are key drivers, alongside our traditional cleanroom, healthcare and industrial projects.

Contact Us

Please contact us either by phone or email we can be found at the following addresses:


  • Head Office & Factory
  • Unit 47 Atcham Business Park, Atcham,
    Shrewsbury SY4 4UG

  • Email : info@middas.co.uk
  • Phone : +44(0)1743 294141

  • London Office
  • Level 3, 12 Greenhill Rents,
    London EC1M 6BN

  • Email : info@middas.co.uk
  • Phone : +44 (0)1743 292674

Social