Cleanroom partition walls | MIDDAS Demountable, steel partitioning systems Demountable Partitioning Solutions - MIDDAS partitioning UK

MIDDAS product development has been rewarded with a major new project win for a confidential client processing semiconductors.

The proven M100 partition system is now offered as a single sided side post and panel system with aluminium core, which has been specifically developed for the semiconductor market.

Its go good when you see a project from initial sketches and basic outlines to the facility nearing completion. Scale is lost on a drawing and it’s only when you walk through a project you appreciate the full scope and how those details really work.

The MIDDAS framework negated the need for secondary steel work, with all services being distributed from the MIDDAS free standing structure.

A very topical update in light of today’s news that fire doors from five manufacturers have been withdrawn from the market after failing post-Grenfell safety tests.

With fire safety absolutely central to all of MIDDAS’ product offering it’s fair to say we were incredibly sensitive not to jump on the post-Grenfell outcry

It’s great to see the MIDDAS structural frame work supporting the distributed services for the new Royal Free Hospital NHS Trust CSSD facility.

MIDDAS have developed the proven M100 wall system to include structural beams offering free-standing facilities for offices through to complex cleanrooms, laboratories and advanced manufacturing facilities.

The MIDDAS freestanding hygienic partitions with fully integrated Dortek doors project is nearing completion.

We have created a barrier to provide people and product segregation with a series of interlocked transfer zones and controlled access ways, which is easily cleaned and maintained (flush finishes with minimum ledges).

MIDDAS offsite manufacture has more than programme benefits.

The advantage of offsite manufacture can be seen by the speed the MIDDAS structural frame has been installed. All components arrive at site, clearly identified and ready to install. We even punch all fixing holes which makes installation a simple assembly process, significantly reducing site construction activity.

The MIDDAS M65 mono block wall system and door sets have been selected for the new MOSFET facility for Diodes Zetex Semiconductors in Oldham.

The MIDDAS wall systems offer a modular solution for the cleanrooms with pre formed corners, column casing and return air ducts. All wall panels are manufactured to size in our UK factory, ready to install with head and floor tracks. This modular approach significantly reduces site construction activity and offers a build clean solution which is key in any Semi facility.

Precision Cleanrooms have recently selected and installed MIDDAS wall panels, flush glazed screens and door sets for a prestigious cleanroom build in Ireland.

MIDDAS manufactured the M65 panels to size ready for installation, significantly reducing site construction activity.

At MIDDAS we are now supplying our fire rated, flush glazed walls and vision panels for installation into masonry and stud & plaster walls, as well as 3rd party Cold Room panels.

‘Made in Britain’ – as a primary UK manufacturer we offer a wide range of sizes in both 30 minute and 60 minute

A significant new project win places MIDDAS firmly in the Healthcare Sector and was won against traditional construction methods!

MIDDAS has been selected by cfes Limited to design and deliver the architectural envelope for a new Off-Site CSSD (Central Sterile Services Department) for the Royal Free London NHS Trust, a new high-tech, centralised facility for Barnet Hospital, Chase Farm Hospital and the Royal Free Hospital.  Our scope includes all the walls, doors and ceiling systems and will show case MIDDAS’ industry leading, modular, off-site construction capabilities; whilst meeting the highest healthcare standards.

The finishing details of any facility are key to its performance and appearance.

Having seen many facilities where the interface between the wall system and flooring is ad hoc and often hidden with a cover strip that introduces ledges and broken surfaces; MIDDAS have developed an innovative recessed base detail

It’s amazing what you can see when you look through the MIDDAS fire rated modular glazed screens in the Module 4 reception at JLR’s world class engine manufacturing facility i54.

With 60 minute Fire Rating and installed to a height of 7.6 meters our M100 glazed wall provides a great window to the advanced manufacturing within.

 

The final fire test of 2015 saw MIDDAS put our M100 cleanroom partition system with flush glazing through its paces. This test also incorporated integrated electrical sockets positioned on either side of the test specimen, an industry first.

In 2014 MIDDAS successfully completed the Pharma Suite extension at Fisherman’s Friend in Fleetwood, supplying our newly developed M100 bi-panel, cleanroom partition system to JVX Projects Ltd.

Having demonstrated the superior quality of both our products and service over the previous providers of cleanroom partition products to the site, JVX have again appointed MIDDAS to supply our systems

Contact Us

Please contact us either by phone or email we can be found at the following addresses:


  • Head Office & Factory
  • Unit 47 Atcham Business Park, Atcham,
    Shrewsbury SY4 4UG

  • Email : info@middas.co.uk
  • Phone : +44(0)1743 294141

  • London Office
  • Level 3, 12 Greenhill Rents,
    London EC1M 6BN

  • Email : info@middas.co.uk
  • Phone : +44 (0)1743 292674

Social