MIDDAS | MIDDAS Demountable, steel partitioning systems Demountable Partitioning Solutions - MIDDAS partitioning UK

The MIDDAS structural framework for our M100 non- progressive bi panel partition system not only supports our pre finished wall panels but is designed to allow services to be easily routed through it and can be configured to support and integrate process and HVAC services into the cleanroom envelope, all pre engineered off site ready to install.

Our latest range of flush glazed door sets, manufactured by MIDDAS here in Shrewsbury have been received very well by our cleanroom clients and those within the commercial fit-out sector.  These are destined for a major Pharmaceutical project in Switzerland and have been specifically engineered for end-user specified door furniture and controls which have been fitted in our factory, significantly reducing installation time on site.

MIDDAS Free-Standing Pods have been installed for critical activities (temperature, acoustic and environmentally controlled) within a major Automotive facility here in the UK. The MIDDAS Free-Standing Pods have integral framework that is designed to support distributed services, the MIDDAS pod cap and suspended ceiling below.

Another full load destined for a major pharmaceutical project in Europe during these unprecedented times.

MIDDAS are busy supporting Healthcare projects across the UK and Europe fully in-line with the UK Government Guidelines.

For more information on MIDDAS Cleanroom Partitions, Doors and Ceilings please get in touch, we are open and ready to help.

 

Great to hear during yesterday’s Government briefing that one of our recent cleanroom projects with ISO 4 and ISO7 classifications is playing a key part in the fight against COVID 19.

Due to ongoing pharmaceutical and healthcare projects and increased demand for our Cleanroom products, our factory is still fully operational but with capacity for Partitions, Doors and Ceilings; fully fire rated if required.

T-Squared have awarded MIDDAS two major cleanroom projects where MIDDAS will supply specialist cleanroom walls, doors, flush glazing, walk-on ceiling systems and plenums for a range of high-grade cleanrooms and support areas up to ISO4 Classification.

The projects will be modelled in BIM and benefit from off-site manufacture, significantly reducing on-site construction activity and aiding clean build protocols.

For more information on MIDDAS specialist cleanroom solutions please get in touch with Trevor Drummond.

MIDDAS have been awarded a major healthcare project at the BUPA Cromwell Hospital for an new Adult Intensive Care Unit (AICU) by Howorth Air Technology, BUPAs delivery partner for this prestigious project.

The project required a modular partition solution with excellent acoustic performance and fire rating (60 minutes integrity and insulation) which is backed by MIDDAS’s extensive test data.

Having identified MIDDAS as a supplier of demountable fire rated partitions. Chelsea FC are delighted with the end result designed, manufactured and installed by MIDDAS.

Development and testing of the MIDDAS flagship, M100 bi-panel system continues at a relentless pace with the latest focus being sound insulation performance.

MIDDAS have been awarded a new project from KCC Basildon Chemicals, a UK based specialist manufacturer and formulator of silicone emulsions and compounds. The Company is focused on the consumer markets of personal care, pharmaceutical and food, as well as supplying certain niche industrial markets such as silicones for coatings, car care and agrochemicals.

 

MIDDAS product development has been rewarded with a major new project win for a confidential client processing semiconductors.

The proven M100 partition system is now offered as a single sided side post and panel system with aluminium core, which has been specifically developed for the semiconductor market.

Its go good when you see a project from initial sketches and basic outlines to the facility nearing completion. Scale is lost on a drawing and it’s only when you walk through a project you appreciate the full scope and how those details really work.

The MIDDAS framework negated the need for secondary steel work, with all services being distributed from the MIDDAS free standing structure.

Built in safety is often a glib statement but not at MIDDAS. Our integrated design approach ensures safety is designed in and not added as an afterthought.

With any walk-on ceiling or work platform, edge protection is essential and is now an integral feature of the MIDDAS offering. No longer do you need to add secondary edge protection and worry about fixing details and interfacing with the walk-on structure.

Chelsea Football Club, our latest customer, needed a fully demountable fire rated partition system to create safe access routes at their Stamford Bridge stadium. The MIDDAS M100 wall system was selected as it has been independently fire tested as a complete system with doors and vison panels.

Chelsea FC needed a system that facilitated the reconfiguration of their corporate hospitality space in order maximise use outside of match days.  The MIDDAS M100 is fully demountable and each component is numbered for easy re-assembly and re-installation.

Having just recently installed a 6m high fire rated wall for a leading Formula 1 team, it’s great to add a premiership football team to our ever expanding and completely diverse client base.

Contact Us

Please contact us either by phone or email we can be found at the following addresses:


  • Head Office & Factory
  • Unit 47 Atcham Business Park, Atcham,
    Shrewsbury SY4 4UG

  • Email : info@middas.co.uk
  • Phone : +44(0)1743 294141

  • London Office
  • Level 3, 12 Greenhill Rents,
    London EC1M 6BN

  • Email : info@middas.co.uk
  • Phone : +44 (0)1743 292674

Social